PAUFIL®


PAUFIL® formwork is formed by a welded wire mesh, placed between two sheets of transparent polyethylene film (UV-stabilized) thermal bonding. The laminated steel mesh is folded at an angle of 90 °. The angle determines the width of the rim edge and the height of the floor.
PAUFIL® is placed on the supporting element. The slab is placed over the mortar on top of the horizontal face of PAUFIL®and is held in position during concreting.
The steel used in the manufacture of the PAUFIL® complies with the specifications of the standard EN 10020.

Download our catalog